And the best part is all of our talent has left so we are stuck with using the TCs. The poor su---r that needs to sign off their deliverables in Imperial must be worried. She or He will be blamed if anything goes wrong.. TCs never will be
5 replies (most recent on top)
I have yet to find a BTC arm that is filled with talented people. Argentina is packed with dummies. Malaysia is packed with dummies. India is packed with dummies. The later we used for Surveillance Engineering and the number of times they would “surveil” a problem that was literally just discussed was embarrassing. “We have less heat in this unit because of X. X will be fixed next week.” “Okay, Bangalore, are you on the line?” “Yes, everything looks okay but we noticed the temperature in the unit is down which we think is because of Y.” EM and IOL SURE GOT THEIR MONIES WORTH! WINNING!
Low cost centers. There was a memo asking us not to call them that anymore.
So I’ll call them low quality tech centers.
LQTC
BTC only works in BTC
The level of incompetence at BTC is staggering. Yet, the company continues to send work there because that’s what EM wants.