Thread regarding Oracle Corp. layoffs

Oracle Plugs San Jose AI Data Centers Into Massive Bloom Energy Power Deal

https://hoodline.com/2026/04/oracle-plugs-san-jose-ai-data-centers-into-massive-bloom-energy-power-deal/

Oracle is locking in a mountain of electricity for its AI ambitions, signing on for up to 2.8 gigawatts of Bloom Energy fuel-cell power to feed its data-center buildout. An initial 1.2 GW is already under contract and is being rolled out across Oracle projects this year and through 2027. The deal highlights how the AI bo-m is forcing cloud giants to secure their own on-site power instead of waiting in line for slow utility interconnections.


by
| 1 view | | 1 reply (April 15) | Reply
Post ID: @OP+1kp780etk

1 reply

Yeeeharr, let's run the DC on natural gas. Let's pick a really expensive and polluting fossil fuel.

Let's hope that the execs that decided this (and the AI buildout) perish in unimaginable pain.

by
| | Reply
Post ID: @bh+1kp780etk

Post a reply

: