That lab in Middletown is full of oldies. It is used mostly for verification and testing of vendor hardware before deployment into the production network. Lots of imported temps occupy this site. I wonder what would become of them.
no replies yet
All labs are being shutdown and moved to Azure. The lack of labs’ CSO compliance, led mgmt to pull the trigger. Mgmt decided they could automate the buildout of all platforms, currently in labs, and move them to azure. This will open up connectivity , as opposed to the fiefdoms and high walls that labs currently has in place. TechMahindra is doing the work.