Normally Oracle has a 2 year restructuring plan (e.g. 2022 and 2024 plans).
However, in the latest 10-Q, this is now labelled as "Fiscal 2026 Oracle Restructuring Plan". Check it yourself at investor.oracle.com under SEC filings; top of page 11 of the latest 10-Q.
This clarifies that the residual of the $2.1bn available (over $1.1bn) is planned to be spent before the end of the fiscal (in the next 10-11 weeks).
Those calling it a 2-year plan that might run to the end of FY27 are missing this.