Thread regarding National Oilwell Varco Inc. layoffs

Engineering getting cut, 80%. All NPD getting pushed to Canada.

Im getting recruited to be on the team to help assess all engineering projects. Timelines are getting built and projects are getting pushed to Canada. Some will go to China. Any engineers left at CCD will be product support only. Transition starts end of March. 6 months to completion.

by
| 2336 views | | 7 replies (last March 9, 2016) | Reply
Post ID: @OP+GiazTsa

7 replies (most recent on top)

Omg why do you crush my dreams lol here I've been thinking I was literally like a VP or something lol i even made cards lol. You sound like a teenager on twitter.

by
| | Reply
Post ID: @2wmf+GiazTsa

@GiazTsa-1cmt No one takes that expression seriously don't know why you would lol

by
| | Reply
Post ID: @1czs+GiazTsa

Forget China Greengate Manchester is untouchable no work no layoffs must be for a reason

by
| | Reply
Post ID: @1esr+GiazTsa

I don't know how to break this to you buddy, but NOV has several hundred VP's, not just one. You've never heard the saying "Everybody's a VP at NOV!".

by
| | Reply
Post ID: @1cmt+GiazTsa

Confirmed. We had a meeting about this with VP and CEO/CFO. It has been confirmed. Those of you who don't like to hear about these truths will say it is bullshit.

by
| | Reply
Post ID: @1ney+GiazTsa

Bullshit.

by
| | Reply
Post ID: @1tph+GiazTsa

Timelines are getting built? What are they doing? Sending you guys down to time depot, getting some time x 4's, and building a timeline with brawn. I don't know about this "recruit". Canada's had major layoffs recently too. Why would they have any capacity to take on existing NPD projects? Not sure about China's situation, though.

by
| | Reply
Post ID: @1aee+GiazTsa

Post a reply

: