Thread regarding NetApp layoffs

Developer metrics

For code contributors, there’s metrics involved now. Even within tiers of needs improvement, meets, or exceeds, they have top, middle, and low rankings. Basically tracking commits from forked branches of mainstream repos. I’m sure they used this as part of the layoff decisions.


by
| 11 views | | 8 replies (last 22 days ago) | Reply
Post ID: @OP+1ks3cekyt

8 replies (most recent on top)

AI replacements incoming

by
| | Reply
Post ID: @e8+1ks3cekyt

Well, obviously one needs to commit a bug, then commit a bug fix. Double bonus. After all, "the world needs ditch diggers".

by
| | Reply
Post ID: @ds+1ks3cekyt

@OP I remember that OT guy talking about that few years+ back.

by
| | Reply
Post ID: @b4+1ks3cekyt

@a7 In Teams go to PowerBI and look for something called "Engineer Report". Maybe it's only visible to ProdOps, I don't know.

by
| | Reply
Post ID: @ay+1ks3cekyt

I was in the top 5 in the code commits in a 20 member team in the org, yet I was laid off.
You can be laid off for any reason.

by
| | Reply
Post ID: @af+1ks3cekyt

@a5 where can we find it?

by
| | Reply
Post ID: @a7+1ks3cekyt

There's public PowerBI report that you can look at. It has code contribution, jira stories closed, etc metrics for every employee.

by
| | Reply
Post ID: @a5+1ks3cekyt

IMO, this is a terrible way to track developer productivity. There needs to be more nuance. Like how many of your commits make it into production? What about investigate bug work that takes time but involves small code changes. Or being a driver to get something done/fixed but requires other teams to do the actual changes.

by
| | Reply
Post ID: @a4+1ks3cekyt

Post a reply

: