So with the wheels coming off the legacy McD projects (less Middle East) how long can they blame all the problems on CB&I
19 replies (most recent on top)
Agreed - we should call on Jacobs or technip to handle all the EPC work after decades of failures in Tyler, west chase and roger dale.
Finally we agree on something. Lummus does not have an EPC. There is a group of people sitting in Westchase and Rogerdale (Houston) that attempt to be an EPC. However, they do not have a clue what they are doing. They are not an EPC, they are paper pushers that call themselves engineers. They really lack in leadership and have given CB&I a bad name.
Letting Tyler put you down. Now that’s rich.
Didn’t know Lummus attempted EPC. Oh wait isn’t that the vertical integration everyone keeps buying?
What ever you say boss. I just know as a seasoned engineer I would never let Lummus EPC engineer and build my plant.
Keep bashing Tyler and Howe Baker. It shows how much you know. It is good to have pride in your company Lummus but, it is better to have pride in a company that knows what they are doing.
I can remember when Houston (Lummus) kept calling on Tyler to bail them out on projects.
Tyler is almost non-existent now days because everyone has quit. They got tired of your Lummus c-ap.
ABB dropped Lummus, then Lummus ran CB&I in the ground. They blamed it on Tyler, then is was Shaw. Go ahead keep bashing Tyler. Here is you sign "L".
Ole Howe baker hand - that’s like saying I was a pager repairman. Where did my job go?
It is pretty impressive
They will never accept responsibility for anything.