Enbridge allowed to increase operating capacity

The National Energy Board announced the increasing maximum allowable operating pressure on the T-south systems pipeline from 80% to 85% of the capacity that it had at the time of the October explosion. Enbridge officials stated that the company is still working on restoring the capacity to 100%.

https://www.myprincegeorgenow.com/88670/enbridge-increases-operating-capacity/

by
| 1391 views | | 2 replies (last November 21, 2018) | Reply
Post ID: @OP+WclBCyi

2 replies (most recent on top)

It will be interesting to find out what the NEB report says that was the cause of the Prince George rupture. I bet it was Enbridge cheapening out on integrity work.