Jobs per day: 6
Points per day: 77
To be done in an 8hr shift. Without overtime.
Reality breakdown:
Lunch: 30
Morning depot: 5
End of day depot: 15
Total: 50
Drive to each job including drive back to depot in a perfect world where everything is reached in 5 min. Time total: 35
Run meter for all 6 jobs. Where in a perfect world meter never gets stuck and jobs always pass.
Time 6 min. Time total: 36
Time total of unproductive time in a perfect world:121 minutes
That's 2 hrs subtracted from 8= 6hrs of actual productive time. In a perfect world where everything works nothing goes wrong.
But in reality we must complete 8 hrs of work load in 6 hours. And get penalties when we fail