https://www.energyvoice.com/other-news/healthandsafety/122664/shell-canada-contractor-fatality-injured-alberta-frac-site/
1 reply
Prediction, hose was not properly restrained. This was likely a cost/time saving measure. I mean when has a hose, or it's attachments ever failed.