The manufacturer of Vineyard Wind’s offshore wind turbines could cut 900 jobs worldwide after facing heavy financial losses due in part to the aftermath of several blade breaks at key projects.
GE Vernova, the company behind the 853-foot tall turbines being built to the Island’s south, last week proposed the cutbacks to deal with inflation, supply chain challenges and the delays in power production following three separate blade breaks.
https://vineyardgazette.com/news/2024/09/25/after-broken-blade-ge-vernova-could-layoff-hundreds