grid can’t support a second fab

What would you say if the grid can’t supply enough power for a second Malta fab.

by
| 881 views | | 7 replies (last March 19, 2024) | Reply
Post ID: @OP+1rijt61Q

7 replies (most recent on top)

its a old rocket site .. i bet a nuclear power plant can be built there too

by
| | Reply
Post ID: @kzpb+1rijt61Q

Don’t bad mouth dollar tree like that. Dollar tree stock is up over 90% since the GF ipo.

by
| | Reply
Post ID: @1mis+1rijt61Q

GF couldnt even manage power dips. , Tools would crash and management would flail around.. GF is the dollar tree of the semiconductor industry.

by
| | Reply
Post ID: @1iii+1rijt61Q

Not to worry, another GF fab will only get built in Malta if another company takes over FAB8.
The attrition hasn't been this bad since the layoffs for pivot.

by
| | Reply
Post ID: @1ads+1rijt61Q

The generation grid can support it just fine, it’s the delivery infrastructure that’s in need of upgrades- and it’ll get them when the second plant is ready to build.

by
| | Reply
Post ID: @1upu+1rijt61Q

As always great forward thinking by our leadership!

by
| | Reply
Post ID: @1zbu+1rijt61Q

https://www.timesunion.com/state/article/globalfoundries-project-brings-load-new-york-s-18677537.php

by
| | Reply
Post ID: @1ugm+1rijt61Q

Post a reply

: