Thread regarding Intel Corp. layoffs

“Meteor Lake will be our next “Centrino Moment” not can layoffs be far away

ntel Core Ultra 7 155H Underwhelms in PassMark Database Appearance

Another Meteor Lake laptop result, another multi-threading disappointment.

https://www.tomshardware.com/news/intel-core-ultra-7-155h-underwhelms-in-passmark-database-appearance

by
| 1741 views | | 4 replies (last October 26, 2023) | Reply
Post ID: @OP+1pe5GvMM

4 replies (most recent on top)

Meteor lake is a stop gap product on Intel 4 plan to move to Intel 3 process

by
| | Reply
Post ID: @3dia+1pe5GvMM

@Op your post is incoherent. Centrino was Intel's attempt to bundle wireless with mobile processors. At the time, the mobile processors were industry leading and the wireless was inferior.

So, why are you somehow conflating a weak processor to the 'Centrino' strategy? It doesn't make any sense as far as I can tell.

by
| | Reply
Post ID: @2nuf+1pe5GvMM

Is that link credible one? I'm new to the industry

by
| | Reply
Post ID: @udb+1pe5GvMM

Ugh, hopefully this is just early silicon/ucode/BIOS and more optimization work will improve the PRQ release.

Can't really afford another bad showing, the Gen14 reviews were absolutely horrible, getting stomped on by pretty much all the reviewers. And oh that disgusting power consumption vs. AMD, and the Ryzen X3D still rule the gaming workloads.

by
| | Reply
Post ID: @pkd+1pe5GvMM

Post a reply

: