@nor+1pYktzHi, you are correct, the mangers who were in charge of installing the Lightower fiber were, and still are, id!ots. Truly a good-ole-boy system. You were either liked or not. If not, no promotions or advancements. You were not judged on performance. It was headed by the former crazy manager S.L. who made countless bad decisions. Then he carried his yes-men buddies like V.F. on his back up the corporate management ladder. Both of these people were far less qualified than existing Crown personnel at the time to install fiber and the SCN. Then, Crown decided to have the construction team members be responsible for both fiber and SCN. That’s like asking the Accounting team to do HR - a train wreck waiting to happen and which did. Fiber costs to build were too high with long construction times. The Crown 2023 10k SCN build goal will not be met. Guess what will happen to the 14k 2024 SCN build goal? Correct, not met! That’s why carriers are now building/installing their own fiber and SCN. As previously stated by another, Crown’s records of fiber installed to date has much to be desired. Elliot, please sell both the fiber and SCN assets. I hope the buyers of both get it for pennies on the dollar because you will be buying cr-p. A big portion of the Titanic is now under water (JB), with the next section (EMT) hopefully going under very soon, so the bilge pumps (Elliott) are now engaging to stop the rest of this massive ship (Crown) from totally sinking before she is totally sold off.