Third Shift Packaging Lead Sarah Cheever said she found out she was losing her job from a paper tacked to the wall of a Portage Energizer employee breakroom. Energizer’s ‘Shutdown Plan’ will reportedly result in phased closures of both Portage and Fenimore manufacturing facilities
https://www.nbc15.com/2023/02/26/energizer-posts-plans-close-wisconsin-battery-plants/