For those who may not know, the GHQ has been closed since 12/20 because of a water main break on the 12th floor which swamped the floors below, especially the 11th floor which is the only remaining lab floor in the North tower.
This is significant because at the end of August the ELT mandated that all lab floors will be vacated and all labs consolidated onto the 11th floor to save rent $$ and this must be completed before 12/31. Great stress and pressure was placed on all groups to stuff themselves and their equipment onto the 11th floor by the end of the year.
Then came the water break which is not only significant because everyone had moved their equipment to the most impacted floor, and almost everyone was gone due the to the holiday, but also because the ELT in their infinite wisdom to try and save money had also told the JLL folks (building maintenance) that they were no longer needed as well.
Seems like poetic justice that they rush and push to try and save money (like getting out of hardware business just to get right back in again) only to step right into another pile of sh*t instead.