Thread regarding Boeing Co. layoffs

Grey Wolf Helicopter Program Stalled Under Boeing

https://www.defensenews.com/air/2021/08/03/air-force-to-delay-full-rate-production-of-grey-wolf-helicopter/

WASHINGTON — Boeing’s MH-139A Grey Wolf helicopter will enter full-rate production
later than expected, a U.S. Air Force program executive said Tuesday.

The Grey Wolf program was initially scheduled for a Milestone C decision by the end
of fiscal 2021, which would trigger the start of full-rate production.

However, ongoing delays in certifying the aircraft with the FAA will force the service
to push off the milestone, said Col. William Rogers, the Air Force’s program executive
officer for intelligence, surveillance, reconnaissance and special operations forces.

“We are in the process of revisiting our acquisition program baseline,
and will be briefing the [service acquisition executive, Darlene Costello]
in the near future,” he told reporters during a media roundtable.

Rogers declined to provide further details on when the Milestone C decision could
be made, saying it will be up to Costello to approve new target and threshold dates.

The MH-139A is a militarized version of Italian aviation firm Leonardo’s AW139
commercial helicopter, which has already been certified by the
European Union Aviation Safety Agency, but once Boeing got its fingers in the mix
the aircraft became UN-Certifiable

The Air Force and Boeing underestimated how long it would take to obtain
supplemental type certifications (STCs) for the MH-139, which are necessary
to begin developmental testing and make a full-rate production decision,
Rogers said.
On top of that, Boeing is also having to redesign one of the sensor fairings on the
front half of the aircraft, which have been discovered to impact the airflow to the
helicopter’s pitot tubes — potentially leading to incorrect airspeed readings that
can trigger another Max like crash.

by
| 1301 views | | 3 replies (last August 5, 2021) | Reply
Post ID: @OP+1caB2osR

3 replies (most recent on top)

A Boeing Co. 737 Max jet is about to leave for China to conduct a flight
test for regulators, people familiar with the matter said,
a step toward lifting the plane’s more than two-year grounding in the
country following two fatal crashes.
https://www.bnnbloomberg.ca/boeing-737-max-heads-to-china-for-key-test-to-end-flight-ban-1.1636475

The 737-7 was scheduled to take off from Seattle’s Boeing Field
at around 8 a.m. local time, bound for John Rodgers Field outside Honolulu,
according to FlightRadar24, a flight-tracking site.
Boeing didn’t immediately comment.

The Hawaii flight is the first leg of a trip across the Pacific, said the people,
who asked not to be named because the matter is private.
With the Max also barred from Russian airspace, the narrow-body plane
will travel near the equator to China rather than take the shorter northern
crossing that is typically flown by commercial aircraft.
While the Max’s validation flight in China would be a milestone,
the country’s regulators still could take months to wrap up their work
before allowing the plane to resume commercial service.
Boeing sent a delegation of around 35 pilots and engineers to the nation
last month to meet with regulators and prepare for simulator and flight testing.

About 175 nations have cleared the Max deathtrap to resume service after
Boeing redesigned a flight-control system linked to crashes in late 2018
and early 2019 that mսrdered 346 people.

Chief Executive Officer L. Dave Calhoun has been upbeat about
The prospects for the plane-maker and the Max in China,
after U.S. Deputy Secretary of State Wendy Sherman traveled to the
country for diplomatic meetings, begging the regulators with cash in hand
to allow the ill conceived Max back into service.
@1Jjbz+11CjeUhV
@2qxr+11CjeUhV
@2mjv+11CjeUhV
@1mhz+11CjeUhV

by
| | Reply
Post ID: @1yfr+1caB2osR

This is my shocked face.

😑

by
| | Reply
Post ID: @kfk+1caB2osR

BCA _ Best Cгappy Aircraft
BSC _ Boeing Scгap Center
BDS_ Best Defense Scams

by
| | Reply
Post ID: @ibl+1caB2osR

Post a reply

: