Make sure you get your installs done today 😂🤣
16 replies (most recent on top)
I have a bucket and it’s tough with 4 pole runs .. parking is tough with busy streets !!! It’s not easy.. at least with the ladder , no one is in your way !!
F# ck them. Do 3 on a ladder. I would love to see them do 1 on a ladder. Most dangerous job that needs to not be done. All because cheap o cant put a pdo every other pole. 4 pole runs with a ladder you f—in nuts. An i dont want to hear a word from someone with a bucket. This is not your fight.
That’s crazy !!! Wow
Garbage truck with a bucket attached “nice”
I have a bucket , I could fix it all !! I’m not complaining.. job security!!
Wait till hurricane season see how many you can fix a day
I’m on my 3rd fiber install !! What are you on ?
I was able to get 3 fiber installs done today and I’m Sup puts a 4th fiber install in my route
I just saw a contractor driving a sedan with a ladder tied to the roof of his car. I'm wondering if that a$$ clown will be able to bang out 3 a day? I'm sure the 3 install rule only applies to ATS. It's an easy way to pick you off 1 by 1 when you don't get it done. Good luck with that.
There are some places where you can do three a day , like in Drahi's mom's places
3 fiber installs a day company wide LOL
Sure maybe if didn't design the fiber pdo the customer needs to be spliced in 3 poles down. when there is a pdo right in front of their house.
Lucky get 1 done
@qwb+169wgN4z
I'll bet your Parents are proud of the job they did raising you.
Well done Mom and Dad, well done! Any more like him at home?
You must be the type who swings from their supervisors sack.
Maybe in a perfect world 3 a day can get done. We’re not there yet